** South
Strut of New Railway Station
Chief of Project: Yu Xiaoyin
This structure is the strut of the underground garage of South Square
of New Railway Station of Shanghai, so it is under the square. The
plane form of this structure is trapezoid. The shorter line is 104
meters, the longer line is 110 meters and the height is 119.9 meters.
Around this strut, there are some buildings and equipments, which
should be protected. Such as two entrances of subway in the east and
rainwater pipeline whose diameter is 1.8 meters is the southeast.
This rainwater pipeline is buried 1.5 meters high under the ground.
In Moling Road, there are also many pipelines of water, electricity
and gas around this structure.
In order to meet the requirement of dimensions of the building environment,
during the construction period, underground continuous wall was used
as the strut of this project, and in according to the different protection
requirement, we adjust the thickness of the wall and add inside frame
to make use of both wall and frames.
The digging height of the south of this project is 9 meters and the
water digging height is 9.66 meters. There are two reinforced concrete
level braces and in the middle of these braces there is a circle whose
diameter is 82 meters and around these braces, there is truss. These
designs meet the requirement of both support and construction space.
The whole project is successfully completed, and the maximum horizontal
displacement is 5 centimeters.
|
|
|